Our Self Build Conservatory Project

12 FEB 2006

Fitting the rubber gasket

Having visited Hills Rubber in the week, they guillotine some 5mm neoprene sheet into 14 metres of 12mm wide strips.
 
Using the wedge end of a cloths peg to insert neoprene David inserting neprene rubber to seal glass

It is absolutely lashing down with rain without a break so no chance of doing any roofing today so get the neoprene packed behind the glass, this is a slow job pushing it into place using a plastic spatula and the wedge end of wooden clothes pegs, using washing up liquid as a lubricant to get it in place.  This job actually takes all day but looks really neat once it is done.
Blue tarpauline in place to protect against the rain Showing that most of the polycarbonate roof panels are in place

The temporary roof proves robust against the elements so Allison insists that we eat breakfast in the conservatory improvising work surfaces as temporary dining table and chairs.
Improvised table set with breakfast and flowers David eating breakfast
 
   